BHG Site Working

Rebuild workshop — not the public history site

Public site: Preview · Real · burrasa.net (live until cutover)

Prototypes: Burra in the News · Burra Digital Archive

Process

How the rebuild is run. The public site repo is bhgsite2026 (git branch working → Preview → approved → Real). This site is the workshop log. They are easy to confuse by name; they are not the same thing.

Two sites, one House

SiteWhat it is
Public history sitePreview preview1845-bhg.house-of-ur.com, Real real-bhg.house-of-ur.com. Content from bhgsite2026.
BHG Site Working (this)News, meetings, process. Content from bhgsite-working. URL working-bhg.house-of-ur.com.

Related prototypes

Separate from the public history site rebuild:

Fridays

The 28 August meeting asked to keep coming in on Fridays, fix one page at a time on Preview, rather than writing giant comment lists. Emlyn still needs to show the change method and give permission to edit Preview.

Todo

Open work lives in the BHG planning docs and is published on this site: Todo. One item is one cohesive change. Preview vs Real still follows the usual rule — do not ship to Real unless the group has asked.

Documents